THE CHALLENGE
Remove 10 floors in only 30 days in a heavy traffic area with only street load access.
HEADQUARTERS
HOUSTON, TEXAS
PARIS, FRANCE
COMPANY SIZE
0
employees
SPACE SIZE
0
square feet
About Air Liquide
Air Liquide is a world leader in Gases, Technologies and Services for Industry and Health. They are committed to solutions that are safe, reliable, cost-effective and sustainable.
Our Approach
We were brought into this project by a logistics company known as Patsy Leslie & Associates our of Houston, Texas. They were doing the move for the company and needed solutions to remove 10 floors in 30 days.
The building was located in what is known as the Galleria area, which has heavy traffic and only street load access. We were required to start on November 25th and complete by December 31st. The product in the facility was Knoll Reff which are very parts intensive cubicles and more time to remove. We ran two shifts each having a 10 man crew.
We were faced with scheduling conflicts with regards to elevator and dock access.
The Result
It had been stated that the landlord did not believe it could be done and was preparing to charge Air Liquide with a large fee if they extended into January. We completed this near impossible project on time despite having the odds stacked against us, saving the company time and money.
SEE MORE CASE STUDIES
1 million sqft over 8 years
With less than 5% disposed of in landfills.
24 floors in 5 months
We were able to reduce 50% of anticipated costs.
265,000 sqft in 60 days
2,183 stations. 4,000 chairs. 95% landfill diversion.